Reserve products: FCR, aFRR and mFRR

3 min read

A shared product family

European TSOs actually share one and the same product family for frequency management, keeping the grid frequency stable around 50 Hz, even though the national names differ. Belgium historically used the labels R1, primary, R2, secondary, and R3, tertiary, alongside the now standard ENTSO-E labels FCR, aFRR and mFRR. The activation times listed per product below are order-of-magnitude guide values from those European product definitions. The exact technical requirements are in the TSO terms and the European network codes, and those evolve continuously: always verify the current Elia documentation for precise figures.

FCR: Frequency Containment Reserve

FCR responds extremely fast and proportionally to any deviation of the grid frequency from the nominal 50 Hz: the greater the deviation, the harder the product adjusts. It must be deployable both upwards and downwards, symmetric products are the standard here. That makes FCR crucial for immediately stopping fast frequency drops or rises, with full activation within about 30 seconds. It is particularly suited to your battery as soon as it is prequalified, thanks to fast inverters: the remuneration here is typically dominated by the capacity availability, simply standing ready, not by the effective activation energy.

aFRR: automatic Frequency Restoration Reserve

aFRR is activated via automatic TSO control signals, with setpoints, target values your asset must follow, that remain valid for only a few seconds. It requires precise, continuous tracking within a strict tolerance band, and serves for the finer restoration of the control zone balance, with full activation within about 5 minutes. Here both the capacity and the activation energy economics count, and it places high demands on communication latency, how fast the signal reaches your asset, and control quality.

mFRR: manual Frequency Restoration Reserve

mFRR is the slower reserve of the three, intended for larger or longer-lasting imbalances. It works via manual or scheduled activation workflows and steps in as soon as aFRR is already saturated, its full capacity already deployed, with full activation within about 12.5 to 15 minutes. Activation duration and energy prices strongly determine how much a provider is left with here. Demand response and slower assets therefore often fit this product better than FCR.

Auction and settlement themes

Capacity is often procured in time blocks, for example multi-hour strips, via daily or other auctions. Activation then follows a merit order of energy bids: cheapest first. Pay-as-bid, you get your own bid price, versus pay-as-cleared, everyone gets the same clearing price, can also differ between the capacity and the energy leg of one and the same product. Finally, Transfer of Energy frameworks allocate the activated volumes correctly, so that BRPs and flexibility providers are settled accurately.

Portfolio delivery

Individual homes rarely reach the minimum bid sizes of these markets on their own. Aggregation in a virtual power plant lets many small batteries act together as one prequalified reserve unit, with shared availability, failover, a back-up that steps in in case of failure, and shared baselines. That is exactly what SEG does for the FCR participation of your battery: on your own you would never meet the minimum requirements, but as part of the SEG portfolio you do.

Why this is relevant for you as a customer

FCR participation does come at a small price: part of your battery capacity always remains reserved for possible activation, and therefore cannot be used at the same time for pure market arbitrage. SEG continuously weighs up that trade-off, based on the current FCR remuneration versus the expected market revenue of that same capacity.

Free advice call

Ready to manage your energy more smartly?

Leave your details and a Smart-E-Grid expert will contact you to schedule a no-obligation appointment.

  • Reply within 1 working day
  • Personal advice tailored to your installation
  • Completely free and no obligation

Request a no-obligation conversation

Get in touch Request a quote